Free Welding Calculators & Reference

Welding Calculators & Reference

Free welding calculators and reference tools for AWS D1.1:2025 and A2.4. Precalentamiento, Aporte Térmico, fillet Tamaño, Equivalente de Carbono — plus symbol charts, Cumplimiento guides, and Q&A for fabricators and inspectors.

WS
WPS Guide
What goes into a WPS under D1.1. Precalificado vs qualified, Table 5.5 essential variables, format Requisitos.
WP
How to Fill Out a WPS Form
Field-by-field walkthrough of the D1.1 Annex J form. Table 5.5 variables, tolerances, common mistakes.
PW
Prequalified WPS
Clause 5 requirements for prequalification: approved processes, Table 5.6 steels, Figure 5.1 joints.
CW
Code Minimum vs WPS
Hierarchy when a customer says D1.1 prohibits what your WPS allows. §1.5 Engineer authority, §1.7 shall/should/may, §5.2 WPS variables.
EOR
EOR Weld Especificación Drawings
What belongs in Documentos contractuales vs Contratista WPS details under D1.1 Clauses 1.5 and 5.2.
T
Weld Group Torsion
Double Soldadura de Filete group torsion: force-couple spacing, eccentricity, and D1.1 Cláusula 4.7 boundaries.
FAT
D1.1 Fatigue Categories
Table 4.5 fatigue stress categories, threshold ranges, and the difference from preheat categories.
GAS
ER80 vs ER90 (Gas de protección)
When a shielding gas change silently breaks an ER90 assumption. A5.28 §3.2 exception + D1.1:2025 Clause 5.6.4 prequalified gas rules.
GMAW
GMAW Shielding Gas
D1.1:2025 Clause 5.6.4 gas substitution paths, Table 5.10 ranges, OE formula, and flow-rate tolerance.
FLG
Welding Across I-Beam Flanges
D1.1 Table 4.5 fatigue categories for transverse welds across beam flanges, plus D1.5 FCM context.
PQ
PQR — Procedure Qualification
When a PQR is required under D1.1. Table 6.6 essential variables and the prequalified exception.
D1
AWS D1.1:2025 Overview
What D1.1 covers, 11-clause overview, prequalified vs qualified WPS paths.
CJ
CJP Weld Guide
Complete joint penetration welds: prequalified joints per Figure 5.1, Respaldo requirements, CJP vs PJP.
MT
Mill Test Report (MTR)
How to read an MTR for D1.1 compliance: ASTM spec to Table 5.6 group to preheat lookup.
Interpass Temperature
D1.1 minimum equals preheat, Máximo when CVN or material requirements apply.
HT
Post-Weld Heat Treatment
D1.1 Section 7.8 PWHT requirements: when it applies, Temperatura ranges, and hold times.
80
Welding Standards Hub
All 80 welding codes covered by Flux: D1.x, ASME IX, API 1104, CSA W59, EN 1011-2, AS/NZS 1554.
15Q
CWI Readiness Check
15-question diagnostic across 5 BoK topics. ~4 minutes. Per-topic weakness report emailed.