AWS D1.1:2025 · Tabel 5.11 · Kategori B

Preheat A709 Gr.50 untuk SAW — up to 3/4"

Suhu pemanasan awal dan antar lajur minimum untuk A709 Gr.50 dilas dengan SAW pada ketebalan up to 3/4", sesuai AWS D1.1:2025 Tabel 5.11.

Berdasarkan AWS D1.1:2025 Tabel 5.11 — setiap nilai dilacak ke pasal.

Suhu Minimum Pemanasan Awal dan Antar Lajur
32°F / 0°C
Kategori B
Proses SMAW, SAW, GMAW atau FCAW hidrogen rendah
AWS D1.1:2025 Tabel 5.11, §5.7
Bila suhu logam dasar di bawah 32°F [0°C], panaskan awal hingga minimum 70°F [20°C] dan pertahankan selama pengelasan (Tabel 5.11 catatan kaki a).
Alat referensi. Verifikasi terhadap edisi yang berlaku dan WPS yang disetujui Insinyur.

SAW (Submerged Arc Welding)

SAW submerges the arc beneath granular flux for highest deposition rates, flat/horizontal only. Category B in Table 5.11.

SAW with F7A2-EM12K wire/flux delivers the highest deposition rates for flat-position fillet welds on building steel. Typical parameters: 500-700 amps, 28-32 volts, 18-30 IPM travel speed. Flux consumption runs approximately equal to wire consumption by weight. Unfused flux recovery and recycling systems are standard in production shops to control consumable costs.

SAW Tips for Common Structural Steels

For A709 Grade 50 bridge steel (50 ksi yield, Category B only), SAW is the dominant process for plate girder web-to-flange continuous fillet welds — a 100-foot girder requires 200+ feet of fillet weld per girder (two sides), making SAW deposition rates of 15–35 lb/hr transformative for production. F7A2-EM12K at 600–750 A with a column-and-boom manipulator handles these long seams.

Typical values for reference — always verify against your approved WPS and electrode manufacturer data.

Why SAW for A709 Gr.50 at up to 3/4"

Why SAW for A709 Gr.50 at up to 3/4"? SAW delivers 15-40 lb/hr deposition — the highest deposition rate among available processes. Position capability: flat and horizontal only. Suitability: shop only.

A709 Gr.50

ASTM A709 Grade 50 is the standard bridge plate and shape grade with 50 ksi minimum yield and 65 ksi minimum tensile, commonly specified for highway bridge plate girder flanges, webs, floor beams, and cross-frames. It falls under Category B only in Table 5.11, requiring low-hydrogen welding processes. Chemistry mirrors A572 Gr.50 (0.23% max carbon, Nb/V microalloying) with CVN testing per AASHTO temperature zone requirements. A709 Gr.50 accounts for the majority of bridge steel tonnage in North America. Flange plate thicknesses routinely reach 2-3" on large plate girders, making preheat compliance at the upper Table 5.11 tiers a significant production consideration for bridge fabrication shops during cold-weather operations.

Mengapa Preheat Ini untuk A709 Gr.50 dengan SAW

Standard 50 ksi bridge plate for girders and cross-frames. This steel is prequalified only with low-hydrogen processes under Table 5.11. With SAW, the submerged arc process with granular flux produces controlled hydrogen levels, with flux condition being the primary variable. The 32°F minimum preheat balances the steel’s strength level and carbon equivalent against the hydrogen control provided by SAW. Non-low-hydrogen SMAW is not an option for this grade under D1.1 prequalified WPS.

Aplikasi Umum untuk A709 Gr.50

Standard for highway bridge plate girder flanges, box girder webs, cross-frame angles, bearing sole plates, splice plates in bolted-welded connections, and composite deck studs. A709 Gr.50 is the baseline strength grade for most modern highway bridge design per AASHTO LRFD. Flange butt splices, web-to-flange continuous fillet welds, and bearing stiffener clips are the dominant weld types in girder fabrication. Girder flanges typically range from 3/4" to 3" thick with widths from 12" to 30", requiring extended preheat soak times on thicker flange splices. Bridge fabrication shops certified to AISC Major Steel Bridge category maintain dedicated preheat tracking logs for each flange splice throughout the production sequence. Web-to-flange fillet welds on plate girders often exceed 100 feet of continuous weld per girder, making SAW the standard process for these joints. Flange splice CJP groove welds undergo 100% UT examination per D1.5.

Mengapa Preheat Penting pada up to 3/4"

Thin material sheds heat quickly, allowing hydrogen to escape the HAZ readily — lowest preheat tier in Table 5.11.

Baja Lain dengan SAW pada up to 3/4"

BajaKategoriPreheat
A36B32°F (0°C)
A633 Gr.EC50°F (10°C)
A709 HPS70WC50°F (10°C)
A710 Gr.AC50°F (10°C)

Coba Kombinasi Berbeda

Gunakan kalkulator preheat interaktif untuk mencari kombinasi baja, proses, dan ketebalan dari D1.1:2025 Tabel 5.11.

Berapa preheat minimum untuk A709 Gr.50 dengan SAW pada up to 3/4"?
Untuk A709 Gr.50 dilas dengan SAW pada ketebalan up to 3/4", suhu preheat minimum adalah 32°F (0°C) sesuai AWS D1.1:2025 Tabel 5.11, Kategori B.
Kategori Tabel 5.11 apa yang berlaku untuk A709 Gr.50 dengan SAW?
A709 Gr.50 dilas dengan SAW termasuk Kategori B di AWS D1.1:2025 Tabel 5.11. Proses SMAW, SAW, GMAW atau FCAW hidrogen rendah. Pada ketebalan up to 3/4", kategori ini memerlukan preheat minimum 32°F (0°C).
Apakah A709 Gr.50 memerlukan preheat pada up to 3/4"?
Pada ketebalan up to 3/4" dengan SAW, preheat minimum adalah 32°F (0°C) — secara efektif suhu ambien di atas titik beku. Tidak diperlukan pemanasan awal aktif kecuali logam dasar di bawah 32°F.

Data referensi D1.1:2025. Tidak berafiliasi dengan AWS.