AASHTO/AWS D1.5:2025 · Tabel 12.4/12.5 · Fraktur Kritis · H8

Preheat M270M Gr.250 — H8, Mid HI, 40–60 mm: 200°F

Persyaratan preheat fraktur kritis untuk M270M Gr.250 / M270 Gr.36 pada ketebalan 40–60 mm (1½–2½ in) dengan penunjukan hidrogen H8, sesuai AASHTO/AWS D1.5:2025, Kode Pengelasan Jembatan.

Berdasarkan AWS D1.5:2025 — setiap nilai dilacak ke pasal.

Preheat dan Interpass Minimum Fraktur Kritis
200°F / 90°C
Hidrogen H8 · masukan panas 2.0–2.8 kJ/mm · ketebalan 40–60 mm (1½–2½ in)
AASHTO/AWS D1.5M/D1.5:2025 Tabel 12.4/12.5
Penunjukan H8: bahan habis pakai mengendapkan ≤ 8 mL/100g hidrogen difusibel sesuai AWS A4.3. Hidrogen lebih rendah = preheat lebih rendah.
Alat referensi. Verifikasi terhadap edisi yang berlaku dan WPS yang disetujui Insinyur.

M270M Gr.250 / M270 Gr.36

AASHTO M270M Gr.250 (M270 Gr.36) is the metric/US customary designation for the basic structural bridge steel with 250 MPa (36 ksi) minimum yield. It is the direct bridge equivalent of ASTM A709 Gr.36, procured under AASHTO M270 with mandatory Charpy V-notch testing per temperature zone. Used for secondary bridge members — lateral bracing, diaphragm plates, floor beam stiffeners, and bearing components where Gr.345 strength is not needed. Non-fracture-critical preheat follows Table 6.3 Group 1; fracture-critical follows Tables 12.4/12.5 with hydrogen and heat input as additional variables.

Memahami Preheat FC untuk M270M Gr.250 / M270 Gr.36

Basic 250 MPa (36 ksi) bridge steel for secondary members. Under D1.5 fracture-critical requirements (Clause 12), the combination of H8 hydrogen designation and this heat input band requires 200°F minimum preheat at 40–60 mm (1½–2½ in). Lower hydrogen levels (H4 < H8 < H16) allow lower preheat because less hydrogen enters the weld deposit. Similarly, higher heat input reduces preheat requirements because slower cooling rates give hydrogen more time to diffuse out.

Di Mana M270M Gr.250 / M270 Gr.36 Digunakan

Specified for secondary bridge members under AASHTO LRFD — lateral bracing angles, diaphragm plates, floor beam stiffeners, bearing seat components, and railing posts. Gr.250 (36) requires CVN testing per AASHTO temperature zone, distinguishing it from plain ASTM A36 by guaranteeing fracture resistance at the bridge design service temperature. Transverse stiffener fillet welds and floor beam web-to-flange joints are high-frequency fabrication details. Temperature zones (1 through 3) determine CVN test temperature: Zone 1 at 21°C (70°F) for moderate climates, Zone 2 at 4°C (40°F) for cold, Zone 3 at -12°C (10°F) for severe cold.

Kontrol Hidrogen H8 untuk M270M Gr.250 / M270 Gr.36

H8 designation (8 mL/100g max) on Gr.250 (36) provides a balanced approach between preheat economy and consumable availability. Most structural SMAW electrodes and FCAW wires carry H8 classification as the standard low-hydrogen tier. For secondary bridge members, H8 is typically the default specification unless the Engineer specifically mandates H4.

Mengapa Preheat Penting pada 40–60 mm (1½–2½ in)

Material from 40 to 65 mm (1-1/2 to 2-1/2 in) covers heavy girder flanges, thick splice plates, and main member plate. This is the critical thickness range for bridge fabrication — preheat reaches 65°C (150°F) for Group 1 and 80°C (175°F) for Group 2. FC preheat at this thickness can exceed 200°C (400°F) depending on hydrogen level and heat input.

M270M Gr.250 / M270 Gr.36 pada 40–60 mm (1½–2½ in)

Gr.250 (36) at 40–65 mm is uncommon in modern designs because Gr.345 handles the same loads at lighter weight. When specified, it appears in bearing seats and massive foundation assemblies where material cost is secondary to simplicity. At this thickness the HAZ cooling rate is significantly slower, and the 150°F preheat reflects the need to keep cooling rates below the critical rate for hydrogen-induced cracking in the coarse-grained HAZ.

Baja Jembatan Lain pada H8 2.0–2.8 kJ/mm · 40–60 mm (1½–2½ in)

BajaTabelPreheat
M270M Gr.345 / M270 Gr.50A200°F (90°C)
M270M Gr.345W / M270 Gr.50WB300°F (150°C)
M270M HPS345W / M270 HPS50WB300°F (150°C)
M270M HPS485W / M270 HPS70WB300°F (150°C)

Coba Kombinasi Berbeda

Gunakan Kalkulator Preheat Jembatan D1.5 untuk mencari baja AASHTO M270, tingkat hidrogen, dan kombinasi masukan panas. Lihat juga Kalkulator Preheat D1.1 untuk baja struktural.

Berapa preheat FC untuk M270M Gr.250 / M270 Gr.36 dengan H8 pada 40–60 mm (1½–2½ in)?
Untuk fraktur kritis M270M Gr.250 / M270 Gr.36 dilas dengan bahan habis pakai bertanda H8 pada ketebalan 40–60 mm (1½–2½ in) dan masukan panas 2.0–2.8 kJ/mm, preheat minimum adalah 200°F (90°C) sesuai D1.5 Tabel 12.4/12.5.
Apa perbedaan antara preheat FC dan NFC untuk M270M Gr.250 / M270 Gr.36?
Preheat non-fraktur kritis (Tabel 6.3) adalah pencarian sederhana berdasarkan ketebalan. Preheat fraktur kritis (Tabel 12.4–12.8) menambahkan tingkat hidrogen dan masukan panas sebagai variabel, biasanya memerlukan preheat lebih tinggi.
Bagaimana masukan panas mempengaruhi preheat FC M270M Gr.250 / M270 Gr.36?
Masukan panas lebih tinggi berarti laju pendinginan lebih lambat, memberikan hidrogen lebih banyak waktu untuk berdifusi keluar dari zona las. Pada 2.0–2.8 kJ/mm, preheat 200°F menyeimbangkan tingkat hidrogen dan laju pendinginan.
What preheat is needed for 50 mm thick bridge plate?
For non-fracture-critical: 65°C (150°F) for Group 1 grades, 80°C (175°F) for Group 2. For fracture-critical: consult Tables 12.4–12.8 based on the specific steel grade, hydrogen designator, and heat input. FC preheat at this thickness is typically 90–200°C (200–400°F) depending on those variables.

Data referensi D1.5:2025. Tidak berafiliasi dengan AWS atau AASHTO.