AWS D1.1:2025 · Table 5.11 · Category B

A709 Gr.50 Preheat for FCAW — over 2-1/2"

Per AWS D1.1:2025 Table 5.11, the minimum preheat for A709 Gr.50 welded with FCAW at over 2-1/2" is 225°F (110°C), Category B. Preheat below this raises hydrogen-cracking risk in the heat-affected zone; the same temperature is the minimum interpass limit maintained through the weld.

Built on AWS D1.1:2025 Table 5.11 — every value traced to the clause.

Minimum Preheat & Interpass Temperature
225°F / 110°C
Category B Low-hydrogen SMAW, SAW, GMAW, or FCAW process
AWS D1.1:2025 Table 5.11, §5.7
Reference tool. Verify against project-applicable edition and Engineer-approved WPS.

Have a preheat question? Ask Flux

FCAW (Flux Cored Arc Welding)

FCAW uses tubular flux-cored wire, available gas-shielded (E71T-1) or self-shielded (E71T-8) for field work. Category B in Table 5.11.

E71T-1 gas-shielded wire is the workhorse for structural steel erection fillet welds. Self-shielded E71T-8 is preferred for field welding where wind makes gas shielding unreliable. Deposition rates run 8-12 lb/hr depending on wire diameter and position. The flux core provides a protective slag that supports the puddle in vertical-up and overhead positions.

Why FCAW for A709 Gr.50 at over 2-1/2"

Why FCAW for A709 Gr.50 at over 2-1/2"? FCAW delivers 8-12 lb/hr deposition — compared to <a href="/welding/preheat-calculator/a709-50/saw/over-2-1-2-inch/">SAW</a> at 15-40 lb/hr. Position capability: all positions. Suitability: field and shop.

Filler Metal for FCAW

Gas-shielded: E71T-1C (AWS A5.20, classified with 100% CO2) or E71T-1M (classified with 75 to 80 percent argon, balance CO2). The C and M designators identify the shielding gas used for classification; the actual gas must follow the electrode manufacturer and the qualified WPS. Self-shielded: E71T-8 (no external gas, field-ready). Diameter: 0.045" standard, 1/16" for high-deposition. Stick-out: 3/4" to 1-1/4" (longer than GMAW due to resistive heating of flux core).

Typical values for reference — always verify against your approved WPS and electrode manufacturer data.

A709 Gr.50

ASTM A709 Grade 50 is the standard bridge plate and shape grade with 50 ksi minimum yield and 65 ksi minimum tensile, commonly specified for highway bridge plate girder flanges, webs, floor beams, and cross-frames. It falls under Category B only in Table 5.11, requiring low-hydrogen welding processes. Chemistry mirrors A572 Gr.50 (0.23% max carbon, Nb/V microalloying) with CVN testing per AASHTO temperature zone requirements. A709 Gr.50 accounts for the majority of bridge steel tonnage in North America. Flange plate thicknesses routinely reach 2-3" on large plate girders, making preheat compliance at the upper Table 5.11 tiers a significant production consideration for bridge fabrication shops during cold-weather operations.

Why This Preheat for A709 Gr.50 with FCAW

Standard 50 ksi bridge plate for girders and cross-frames. This steel is prequalified only with low-hydrogen processes under Table 5.11. With FCAW, flux-cored wire in FCAW provides a combination of deoxidizers and low-moisture flux formulations that control hydrogen. The 225°F minimum preheat balances the steel’s strength level and carbon equivalent against the hydrogen control provided by FCAW. Non-low-hydrogen SMAW is not an option for this grade under D1.1 prequalified WPS.

Typical Applications for A709 Gr.50

Standard for highway bridge plate girder flanges, box girder webs, cross-frame angles, bearing sole plates, splice plates in bolted-welded connections, and composite deck studs. A709 Gr.50 is the baseline strength grade for most modern highway bridge design per AASHTO LRFD. Flange butt splices, web-to-flange continuous fillet welds, and bearing stiffener clips are the dominant weld types in girder fabrication. Girder flanges typically range from 3/4" to 3" thick with widths from 12" to 30", requiring extended preheat soak times on thicker flange splices. Bridge fabrication shops certified to AISC Major Steel Bridge category maintain dedicated preheat tracking logs for each flange splice throughout the production sequence. Web-to-flange fillet welds on plate girders often exceed 100 feet of continuous weld per girder, making SAW the standard process for these joints. Flange splice CJP groove welds undergo 100% UT examination per D1.5.

Why Preheat Matters at over 2-1/2"

The heaviest sections demand the highest preheat in Table 5.11. Multi-pass sequences require maintaining interpass temperature throughout.

Other Steels with FCAW at over 2-1/2"

SteelCategoryPreheat
A709 HPS50WB225°F (110°C)
A709 HPS70WC300°F (150°C)
A710 Gr.AC300°F (150°C)
A913 Gr.70C300°F (150°C)
What is the minimum preheat for A709 Gr.50 with FCAW at over 2-1/2"?
When welding A709 Gr.50 at over 2-1/2" using FCAW, the minimum preheat temperature is 225°F (110°C) per AWS D1.1:2025 Table 5.11, Category B. FCAW places this combination in Category B. This is also the minimum interpass temperature — the joint must not cool below 225°F between passes.
What Table 5.11 category applies to A709 Gr.50 with FCAW?
When using FCAW on A709 Gr.50, the combination falls under Category B in AWS D1.1:2025 Table 5.11. Low-hydrogen SMAW, SAW, GMAW, or FCAW process. At over 2-1/2" thickness, Category B with FCAW requires a minimum preheat of 225°F (110°C).
Why is preheat 225°F for A709 Gr.50 at over 2-1/2"?
The 225°F preheat for A709 Gr.50 at over 2-1/2" when using FCAW reflects the combination of the steel's hardenability and the increased restraint at this thickness. FCAW delivers controlled hydrogen levels, but at this thickness the preheat must slow the cooling rate in the heat-affected zone, giving diffusible hydrogen more time to escape before the steel transforms to a crack-susceptible microstructure.
How do I maintain preheat on very thick plate?
For material over 2-1/2”, preheat is typically applied with oxy-fuel torches or electric resistance blankets and monitored with contact thermometers or temp-sticks. The entire weld zone must reach the minimum temperature before welding begins, and interpass temperature is checked before each new pass. Insulating blankets help retain heat during pauses in multi-pass welding.

D1.1:2025 reference data. Not affiliated with AWS.