AWS D1.1:2025 Quick Reference
Single-page summary of AWS D1.1:2025 Stahlbau-Schweißnorm — Steel. All 11 clauses, the most-cited tables (5.7, 5.11, 7.7, 8.1), Vorqualifiziert vs qualified rules, steel categories, and Prüfung scope. For fast lookups on the shop floor or in the Prüfer booth.
AWS D1.1:2025 covers welded Baustahl up to 100 ksi yield Festigkeit and 1/8-inch Minimum Dicke. The 11 clauses are organized by lifecycle: scope, references, terms, design, prequalification, qualification, Fertigung, inspection, plus three specialty clauses (tubular, strengthening/Reparatur, stud Schweißen). Most projects use prequalified WPSs per Abschnitt 5; non-Norm joints require Clause 6 PQR Prüfung.
What AWS D1.1:2025 Covers
AWS D1.1:2025 Structural Welding Code — Steel applies to the design, fabrication, and inspection of welded structural steel construction. The Regelwerk's scope per Clause 1.1 covers carbon and low-alloy steels with a minimum specified yield strength up to 100 ksi (690 MPa) and Grundwerkstoff thickness 1/8 inch (3 mm) or greater.
Materials and structures NOT covered by D1.1: sheet steel under 1/8 inch (use D1.3), Edelstahl (use D1.6), aluminum (use D1.2), reinforcing bar (use D1.4), bridges with cyclic loading or fracture-critical members (use D1.5). Tubular structures are covered in Clause 9 of D1.1 with cross-references to the main body. Stud welding is covered in Clause 11.
Welding processes covered: Shielded Metal Arc (SMAW), Gas Metal Arc (GMAW), Flux-Cored Arc (FCAW gas-shielded and self-shielded), Submerged Arc (SAW), Gas Tungsten Arc (GTAW), and Electroslag/Electrogas (ESW/EGW). Each process has its own essential variables in Tables 5.5 (prequalified) and 6.6 through 6.10 (qualified).
Per AWS D1.1:2025 Clause 1.1.1: “This code contains the Anforderungen for fabricating and erecting welded steel structures. When this code is stipulated in Vertragsunterlagen, conformance with all provisions of the code shall be required, except for those provisions that the Engineer or contract documents specifically modifies or exempts.”
— AWS D1.1/D1.1M:2025, Structural Schweißnorm — SteelThe 11 Clauses of AWS D1.1:2025
| Clause | Title | Covers |
|---|---|---|
| Clause 1 | General Requirements | Scope, applicability, units, base metals covered |
| Clause 2 | Normative References | Referenced standards (AWS A2.4, A3.0, A5 series, ASTM) |
| Clause 3 | Terms and Definitions | Welding terminology defined per AWS A3.0 |
| Clause 4 | Design | Allowable stresses, Nahtausführung, fillet/groove sizing, fatigue |
| Clause 5 | Prequalification of WPSs | Joint details, materials, parameters accepted by reference (no testing) |
| Clause 6 | Qualification | PQR procedure, Mechanische Prüfung, Schweißer/operator qualification |
| Clause 7 | Fabrication | Cutting, fit-up, Vorwärmung application, welder workmanship |
| Clause 8 | Inspection | Inspector qualifications (CWI per QC1), VT, NDT, Abnahme criteria |
| Clause 9 | Tubular Structures | Specific provisions for hollow section connections (HSS, pipe) |
| Clause 10 | Strengthening and Repair | Existing structure modifications, Schweiß repair procedures |
| Clause 11 | Stud Welding | Drawn-arc and capacitor-discharge stud welding requirements |
The lifecycle order — design (4), prequalification or qualification (5/6), fabrication (7), inspection (8) — reflects the order operations are typically performed on a project. Specialty clauses 9, 10, and 11 augment the main body for specific construction Arten.
Most-Cited Tables in D1.1:2025
Table 5.7 — Zusatzwerkstoff Requirements (Prequalified)
Table 5.7 matches base metal categories from Tabelle 5.3 to allowable filler metal classifications per AWS A5 specifications. For Kategorie A and B steels, Niedrigwasserstoff E70xx series electrodes are typically required for SMAW. For Category C and D, supplementary low-hydrogen and chemistry restrictions apply. The filler metal must match or under-match the base metal per the strength compatibility rules in §5.7.1.
Table 5.11 — Minimum Preheat and Zwischenlagentemperatur (Prequalified)
Table 5.11 is the most-referenced table in D1.1 for shop floor work. It specifies minimum preheat in degrees Fahrenheit and Celsius, organized by base metal category, Schweißverfahren group, and base metal Dickenbereich. Per §5.11, preheat is required when the values in Table 5.11 are above ambient Temperatur. Failure to apply preheat is the single most common cause of underbead cracking in Kohlenstoffstahl welds. Use the preheat calculator for instant per-steel lookups.
Table 7.7 — Minimum Kehlnaht Size
Table 7.7 specifies minimum Schenkellänge Größe based on base metal thickness:
| Base Metal Thickness (T) | Minimum Fillet Leg |
|---|---|
| Up to 1/4 inch (6 mm) | 1/8 inch (3 mm) |
| Over 1/4 to 1/2 inch (6 to 13 mm) | 3/16 inch (5 mm) |
| Over 1/2 to 3/4 inch (13 to 19 mm) | 1/4 inch (6 mm) |
| Over 3/4 inch (19 mm) | 5/16 inch (8 mm) |
Per Footnote A, T is the thicker part for Nicht-Niedrigwasserstoff single-pass; T is the thinner part for low-hydrogen processes. Per Footnote C, a 3/16-inch cap applies for cyclically geladen structures regardless of thickness.
Table 8.1 — Sichtprüfung Acceptance Criteria
Table 8.1 specifies Sichtprüfung Zulässigkeitskriterien for fillet, CJP, and PJP welds, separated by static vs cyclic loading. Risse of any size are unacceptable in both load conditions. Einbrandkerbe Grenzwerte are 1/32 inch Maximum for static, 1/100 inch for cyclic per direction-of-stress rules. Porosität individual pore diameter limit is 1/32 inch with frequency limits per the table footnotes. Per §8.9, all visual inspection shall be performed by a qualified inspector per Clause 8.1.4 — typically a CWI per AWS QC1.
Base Metal Categories (Table 5.3)
AWS D1.1:2025 Table 5.3 groups prequalified base metals into four categories based on chemistry and yield strength.
| Category | Yield Range | Examples |
|---|---|---|
| Category A | Up to 50 ksi | A36, A53 Gr B, A106 Gr B, A500 Gr B, A572 Gr 50 |
| Category B | Up to 60 ksi | A572 Gr 60, A588, A992 |
| Category C | Up to 70 ksi | A572 Gr 65, A709 Gr 50W, A709 Gr 70W |
| Category D | Over 70 ksi | A514, A709 Gr HPS 70W, A913 Gr 65/70/80 |
Each category has its own preheat requirements in Table 5.11, filler metal restrictions in Table 5.7, and Wesentliche Variable ranges in Table 5.5. Higher categories require higher preheat and stricter low-hydrogen practice. Knowing the category is the first step in selecting a Vorqualifizierte WPS — wrong category means wrong preheat and risk of cracking.
Prequalified vs Qualified WPS — Decision Logic
Per Clause 5, a prequalified WPS uses a joint, base metal, filler metal, and parameters that the code accepts as qualified by reference. To use a prequalified WPS, ALL of the following must hold:
- Joint matches Figures 5.1 through 5.10 (over 100 prequalified joint details)
- Base metal is in Table 5.3 (one of the four categories above)
- Filler metal matches Table 5.7 for the base metal category
- Preheat meets Table 5.11 minimum for category, process group, and thickness
- All essential variables stay within Table 5.5 ranges per
§5.5
If any prequalified condition cannot be met, a qualified WPS per Clause 6 is required. The Auftragnehmer performs a Verfahrensprüfung (PQR) — weld a Prüfstück to the proposed parameters, then perform mechanical testing per Table 6.4 (tension, bend, optional CVN). The PQR validates the specific parameter combination, and the resulting WPS is qualified for production use within the essential variable ranges of Tables 6.6 through 6.10.
Field tip: Always check prequalification first. PQR testing typically costs $2,000-$5,000 per procedure. If your joint is in Figure 5.1 to 5.10 and your steel is in Table 5.3, prequalification is the cheaper, faster path. Custom joints and high-strength steels (Category D) almost always require Clause 6 qualification.
— CWI shop floor observation, structural Hersteller, 2026Inspection Scope (Clause 8)
Per Clause 8, AWS D1.1:2025 inspection requirements cover three layers: visual inspection (VT), nondestructive testing (NDT), and inspector qualification.
Per §8.9, all welds shall be visually inspected. Visual inspection is performed by personnel meeting the qualification requirements of §8.1.4 — typically a Zertifizierter Schweißfachingenieur (CWI) per AWS QC1, or an equivalent inspector qualification. VT is performed before any volumetric NDT per §8.13.
Per §8.13 and §8.14, NDT methods include Durchstrahlungsprüfung (RT), Ultraschallprüfung (UT), Magnetpulverprüfung (MT), and Eindringprüfung testing (PT). The contract documents specify which welds require NDT and which method. CJP welds in tension typically require either RT or UT per §8.14.5. Statically loaded structures may require less NDT than cyclically loaded.
Acceptance criteria per Table 8.1 for VT, Table 8.2 for tension-loaded welds (RT/UT), and Table 8.3 for compression-loaded welds. The CWI's authority and responsibilities are defined in §8.1 through §8.4 — the inspector verifies WPS, monitors fit-up and welding, performs VT, witnesses or reviews NDT, and signs off on weld acceptance.
How to Cite AWS D1.1 in Procedures and Reports
Formal references: AWS D1.1/D1.1M:2025 Structural Welding Code — Steel, American Welding Society, Miami, FL. The /D1.1M suffix indicates the metric companion document — for SI unit projects use D1.1M:2025.
Within procedures, WPS forms, and inspection reports, the short form AWS D1.1:2025 is acceptable along with the specific clause, table, or figure being referenced. Examples of acceptable inline citations:
per AWS D1.1:2025 Table 5.11— preheat referenceper AWS D1.1:2025 §8.9— inspection scope referenceper AWS D1.1:2025 Clause 6.2.1— PQR testing referenceper AWS D1.1:2025 Figure 5.4— prequalified joint reference
The 2025 edition is the current edition as of April 2026 and supersedes D1.1:2020. Drawings and contracts that reference “AWS D1.1” without an edition default to the latest edition unless explicitly fixed (uncommon and requires explicit owner agreement). When a project transitions from one edition to the next, all related WPSs, PQRs, and inspector qualifications should be reviewed for any code changes that affect the work — see the dedicated AWS D1.1:2025 changes guide for the most-impactful 2025 updates.